GCEM40E Case Study – Implementation in Bydgoszcz

Bydgoszcz Case Study – GCEM 40E The background: The Bydgoszcz Combined Heat and Power Plant (CHP) has a rich history dating back to 1929, with the initial operation of a municipal power plant in Jachcice. Over the decades, the plant expanded, and by 1971, it had formed the Bydgoszcz CHP Group, incorporating the newly established … Читать далее

VCEM5100 Gas Velocity Case Study

Case Study – Electric Arc Furnace (EAF) Steel MillsVCEM5100 The Customer and The Requirements: Electric Arc Furnace (EAF) Steel Mills present many challenges when it comes to monitoring exhaust gases from the furnace outlet. The process is extremely dusty and hot and in no way suitable for most in-situ type measurement instruments. Measuring exhaust gas … Читать далее

Tribo Dust Monitor & Wireless Connectivity Case Study – UK Carbon Black Manufacturing Plant

This case study describes the successful installation of a new wireless environmental monitoring system.

CODEL International Ltd were approached in 2020 by a major UK Carbon Black manufacturer to provide a more cost-effective service solution for monitoring and reporting emissions to air from their dust collectors.

CEMS Extractive Gas Monitor Case Study – Eagle Valley Clean Energy

Eagle Valley Clean Energy, LLC owns and operates a 12MW biomass power plant, generating electricity from combustion of waste wood.

The customer was using a cold dry extractive gas analyser for NOx compliance monitoring which was reported to be old and unreliable due to lack of maintenance which is a heavy requirement of this measurement technique. The customer was
looking to replace this system but had reservations on investing in another extractive gas analyser.

Русский