Port Miami Tunnel CODEL Air Quality Monitoring Beneath Miami’s Biscayne Bay The PortMiami Tunnel is a major transport link connecting PortMiami on Dodge Island directly...
Nghiên Cứu Điển Hình
Atal Tunnel Case Study | Tunnel Monitoring in India
Atal Road Tunnel Delivering Reliable Tunnel Atmosphere Monitoring at One of the World’s Highest Road Tunnels The Rohtang Road Tunnel in Himachal Pradesh, India, is...
EnergyTech 501 Holcim Cement Plant Case Study
Customer Background Holcim operates one of the UK’s largest cement production facilities, where finished cement is transferred through high-pressure pipelines to storage silos prior to...
Case Study: CODEL’s PM Monitor in Road Tunnel
Policy and Mitigation Recommendations To address PM pollution in tunnels, a multi-layered approach is needed: Mandate PM1.0, PM2.5, and PM10 monitoring in tunnels. Enforce exposure...
Case Study: CODEL’s Air Quality Monitoring in the Hsuehshan
Overview The Hsuehshan Tunnel, also known as the Snow Mountain Tunnel, was the longest road tunnel in Asia and the fifth longest in the world...
GCEM40E Case Study – Implementation in Bydgoszcz
Bydgoszcz Case Study – GCEM 40E The background: The Bydgoszcz Combined Heat and Power Plant (CHP) has a rich history dating back to 1929, with...
VCEM5100 Gas Velocity Case Study
The Challenge Electric Arc Furnace (EAF) steelmaking presents particularly demanding conditions for continuous gas flow measurement. Extremely high temperatures, heavy particulate loading and turbulent exhaust...
Tribo Dust Monitor & Wireless Connectivity Case Study –
This case study describes the successful installation of a new wireless environmental monitoring system. CODEL International Ltd were approached in 2020 by a major UK...
Extractive Gas Monitor Case Study – Eagle Valley Clean
Eagle Valley Clean Energy, LLC owns and operates a 12MW biomass power plant, generating electricity from combustion of waste wood. The customer was using a...
TunnelTech 900 Series Case Study – Implementation in Świnoujście
The Świnoujście Tunnel, connecting the Wolin and Uznam islands in the city of Świnoujście, Poland, stands as a remarkable engineering feat. Stretching across 3.4 kilometres,...
Eggbrough Coal-Fired Power Station – Case Study
The Project CODEL carried out a installation of the EnergyTech 201 at Eggborough Power Station, a 2,000 MW coal-fired power station in central England. The...