Casos de estudio

hogar / Sobre nosotros / Casos de estudio

EnergyTech 501 Holcim Cement Plant Case Study

Customer Background Holcim operates one of the UK’s largest cement production facilities, where finished cement is transferred through high-pressure pipelines to storage silos prior to...

Case Study: CODEL’s PM Monitor in Road Tunnel

Policy and Mitigation Recommendations To address PM pollution in tunnels, a multi-layered approach is needed: Mandate PM1.0, PM2.5, and PM10 monitoring in tunnels. Enforce exposure...

VCEM5100 Gas Velocity Case Study

The Challenge Electric Arc Furnace (EAF) steelmaking presents particularly demanding conditions for continuous gas flow measurement. Extremely high temperatures, heavy particulate loading and turbulent exhaust...

Haga una pregunta

Para obtener más información sobre cualquiera de nuestros productos, rellene nuestro formulario de consulta y un miembro del personal le responderá lo antes posible.

También puede llamar al: +44(0)1629 814351











    Español