Port Miami Tunnel Case Study | Tunnel Monitoring in the US

Port Miami Tunnel CODEL Air Quality Monitoring Beneath Miami’s Biscayne Bay The PortMiami Tunnel is a major transport link connecting PortMiami on Dodge Island directly with Miami’s interstate highway network. Running beneath Government Cut in Biscayne Bay, the twin tunnels provide direct access between the port, I-395 and I-95, helping divert cargo trucks, buses and … Đọc tiếp

Atal Tunnel Case Study | Tunnel Monitoring in India

Atal Road Tunnel Delivering Reliable Tunnel Atmosphere Monitoring at One of the World’s Highest Road Tunnels The Rohtang Road Tunnel in Himachal Pradesh, India, is one of the country’s most significant transport infrastructure projects. Stretching 8.8 km beneath the Rohtang Pass at an elevation of almost 4,000 metres above sea level, the tunnel provides a … Đọc tiếp

EnergyTech 501 Holcim Cement Plant Case Study

Customer Background Holcim operates one of the UK’s largest cement production facilities, where finished cement is transferred through high-pressure pipelines to storage silos prior to dispatch. Over time, pipe wear and joint degradation can occur within these pressurised systems, making minor leaks difficult to detect before they develop into larger operational issues. In some cases, … Đọc tiếp

Case Study: CODEL’s PM Monitor in Road Tunnel

Policy and Mitigation Recommendations To address PM pollution in tunnels, a multi-layered approach is needed: Mandate PM1.0, PM2.5, and PM10 monitoring in tunnels. Enforce exposure limits for both occupational and public settings. Upgrade ventilation systems with high-efficiency particulate air (HEPA) filters. Promote low-emission zones within or around tunnel access points. Encourage mode shifts to electric … Đọc tiếp

Case Study: CODEL’s Air Quality Monitoring in the Hsuehshan Tunnel, Taiwan

Overview The Hsuehshan Tunnel, also known as the Snow Mountain Tunnel, was the longest road tunnel in Asia and the fifth longest in the world at the time of its construction. Spanning nearly 13 km, it plays a critical role in Taiwan’s transportation network, forming a key section of the national expressway linking the capital, … Đọc tiếp

GCEM40E Case Study – Implementation in Bydgoszcz

Bydgoszcz Case Study – GCEM 40E The background: The Bydgoszcz Combined Heat and Power Plant (CHP) has a rich history dating back to 1929, with the initial operation of a municipal power plant in Jachcice. Over the decades, the plant expanded, and by 1971, it had formed the Bydgoszcz CHP Group, incorporating the newly established … Đọc tiếp

VCEM5100 Gas Velocity Case Study

The Challenge Electric Arc Furnace (EAF) steelmaking presents particularly demanding conditions for continuous gas flow measurement. Extremely high temperatures, heavy particulate loading and turbulent exhaust gases can make many conventional flow measurement technologies unsuitable. CODEL was approached to provide flow monitoring solutions for two EAF steel mills in the United States, each presenting a different … Đọc tiếp

Tribo Dust Monitor & Wireless Connectivity Case Study – UK Carbon Black Manufacturing Plant

This case study describes the successful installation of a new wireless environmental monitoring system.

CODEL International Ltd were approached in 2020 by a major UK Carbon Black manufacturer to provide a more cost-effective service solution for monitoring and reporting emissions to air from their dust collectors.

Extractive Gas Monitor Case Study – Eagle Valley Clean Energy

Eagle Valley Clean Energy, LLC sở hữu và vận hành một nhà máy điện sinh khối công suất 12MW, chuyên sản xuất điện năng từ quá trình đốt gỗ thải.

The customer was using a cold dry extractive gas analyser for NOx compliance monitoring which was reported to be old and unreliable due to lack of maintenance which is a heavy requirement of this measurement technique. The customer was
looking to replace this system but had reservations on investing in another extractive gas analyser.